The cost per submarine, $y in millions, of assembling submarines can be modelled by
where .
- (i)
Explain the meaning of the constant term 100 in this model.
- (ii)
Express in the form of .
- (iii)
Explain the significance of in (ii).
It won't just hand you the answer — it asks where you're stuck.How the checker works
Worked solution
12(i)
1. Interpret the constant term in the context of the model
The constant term corresponds to the value of when . In the context of the model, this represents the theoretical base cost per submarine (in millions of dollars) before any economies of scale from assembling multiple submarines take effect.
It represents the initial or base cost per submarine, which is million, before the effect of assembling multiple submarines reduces the cost.
12(ii)
1. Factor out the coefficient of $x^2$ from the first two terms
2. Complete the square inside the bracket and simplify
12(iii)
1. Interpret the significance of the vertex $x = h$ in the context of the quadratic model
Since the coefficient of is positive (), the quadratic function has a minimum value at . In the context of the model, is the number of submarines assembled and is the cost per submarine. Therefore, is the number of submarines assembled that results in the lowest possible cost per submarine.
represents the number of submarines that must be assembled to achieve the minimum cost per submarine.
AI analysis — may contain mistakes.
Worked this one out on paper? Snap your steps and Gigle's AI math checker will circle the step where it went wrong.